Project overview
This cogeneration plant heat network project includes 3 heating pipelines, with a total length of 27km. A layout combining above ground and local underground pipelines is adopted. This
project applied WANLI PIPELINE above ground steam piping systems and was co-designed by our company. We provided products along with field construction and installation. The project perfectly satisfied the design expectations
and achieved the customer’s construction goals, maximizing their value.